TechValidate Research on Broadcom Broadcom BlazeMeter


BlazeMeter Case Study

Fortune 500 Chemicals Company

Introduction

This case study of a Fortune 500 chemicals company is based on a February 2020 survey of BlazeMeter customers by TechValidate, a 3rd-party research service. The profiled company asked to have their name blinded to protect their confidentiality.

“Lack of integration in our testing tools is creating longer test cycles.”

“It is important for our teams to easily test “as-code” within their IDE.”

“Test creation and maintenance takes too much time.”

“It is important that testing tools are easy to use for all teams (e.g. testers and developers).”

Challenges

The business challenges that led the profiled company to evaluate and ultimately select BlazeMeter:

  • Considering or moved off LoadRunner due to:
    • Complex cost models
  • Have the following issues holding them back when using LoadRunner:
    • The need for multiple tools for continuous testing

Use Case

The key features and functionalities of BlazeMeter that the surveyed company uses:

  • Said they are currently using LoadRunner.

Results

The surveyed company achieved the following results with BlazeMeter:

  • Were able to set up and start testing with BlazeMeter Within minutes.




About This Data

This data was sourced directly from verified users of Broadcom Broadcom BlazeMeter by TechValidate.

TechValidate verifies the identity and organizational affiliation of all participants that contribute to published research data. When research participants so desire, we also guarantee their anonymity so that they may share information honestly and freely.


More Research on Broadcom Broadcom BlazeMeter