Introduction

This case study of a educational institution is based on a February 2013 survey of Schneider Electric Data Centres customers by TechValidate, a 3rd-party research service. The profiled organization asked to have their name blinded to protect their confidentiality.

Challenges

  • The operational challenge of downtime was solved with the deployment of InfraStruxure.
  • The modular design of the system influenced the purchase decision.

Use Case

  • InfraStruxure is used to support the data center.
  • The InfraStruxure/APC components were purchased in the last 36 months.

Results

  • The InfraStruxure solution was installed and running in under a month.




About This Data

This data was sourced directly from verified users of Schneider Electric Data Centres by TechValidate.